Contract compliance for GCs

Is your contract actually being complied with?

Your owner contract (AIA A101/A201) stipulates what every sub must carry and provide โ€” the insurance limits, the lien waivers due at each payment. ZeroLien reconciles the paper you've collected against what the contract requires, and shows exactly where it doesn't match: a certificate short of the required limit, a payment released without its lien waiver. Compliance, checked across the board.

Request a free review See a sample review
โ‘  Insurance compliance
!
Expired / lapsing certificates on active work
!
No valid AI endorsement behind the COI's claim
!
Wrong scope โ€” ongoing-ops where completed-ops is required
โ‘ก Lien-waiver compliance
!
Pay-apps paid with no lien waiver on file
!
Suppliers / second-tier with preserved lien rights
!
Conditional waiver where unconditional was required
The contract
stipulates every requirement โ€” insurance limits and lien waivers
AIA A201 Art. 11 + 9.3.1
Requirement vs. paper
we reconcile what's required against what you actually collected
a compliance check, not a coverage opinion
Your records
already hold the answer โ€” we read the paper you have
no adoption required

Your contract-compliance review

A sample. Yours reconciles your own certificates and waiver records against your contract's requirements โ€” where you comply, and where you don't.

A ยท Insurance compliance โ€” certificates vs. contract requirement
Expired or lapsing on active work11 of 40
Additional-insured claimed, no endorsement on file5 of 40
Limit below your stated floor7 of 40
Endorsement scope / edition worth review4 of 40

Qualitative โ€” we report what the documents show, not a dollar "uninsured" figure. A certificate isn't the policy and doesn't carry the contract value at risk, so a dollar number off a cert folder alone would be manufactured, not measured. You get the specific documents to take to your broker.

B ยท Lien-waiver compliance โ€” releases vs. payments made
Payment released with no lien waiver on file (4 subs)$1,540,000
Conditional waiver where unconditional was due (3 subs)$820,000
Final unconditional release never collected (2 subs)$610,000
Payments released without the protecting waiver on file$2,970,000

These lien dollars are the sum of real amounts on real pay-app documents you provide โ€” not a projection. Each line ties to a specific payment and a specific missing or wrong document. Where records aren't provided, that exposure isn't shown โ€” we don't estimate it.

Download the full sample review (PDF) →

This isn't our opinion. It's the law.

A certificate of insurance is not coverage โ€” and two courts have made that binding.

A COI confers no rights

ACORD 25 โ€” the standard certificate form โ€” says so in its own words: "issued as a matter of information only and confers no rights... does not constitute a contract." ACORD 25 disclaimer

Additional-insured status needs a signed contract, before the loss

A COI listing you as additional insured does not make you one. AI status requires an actual policy endorsement plus, where the endorsement requires it, a contract executed before the loss. Suffolk Construction v. Illinois Union (2011) ยท United Stationers v. Zurich (2008)

The edition date is material

CG 20 10 covers ongoing operations; CG 20 37 covers completed operations โ€” where most construction-defect claims surface. A 1985 form, a 2004 form, and a 2013 form grant materially different coverage. The wrong one on file is a gap you can't see. ISO endorsement editions, per IRMI

And a paid subcontractor can still lien your property

Payment alone doesn't release a lien right โ€” a signed waiver does. Without the right waiver on file (and the final unconditional release), a sub you've paid, or a supplier the sub never paid, can still record a mechanic's lien against your project. That's the second exposure, and it's why the report reads both. Mechanic's-lien statutes; conditional vs. unconditional release

Everything that can encumber your property โ€” in one place

The COI diagnostic is the front door. ZeroLien tracks the entire compliance chain that puts your project at risk: insurance, waivers, and lien rights.

Insurance

COI & endorsement tracking

Every sub's coverage, edition, and expiry in one view โ€” verified against the backing endorsement, not the certificate's say-so. Automatic renewal reminders so nothing lapses on active work.

Waivers

Lien waiver collection

Conditional and unconditional waivers tracked against every pay application. No waiver, no release โ€” so a paid sub can't turn around and lien the property.

Lien rights

Who can lien your project

Preliminary notices, deadlines, and lien-right status for every party on the job โ€” subs and their suppliers. See the whole chain of who could encumber the property, before they do.

One platform for the COI exposure, the waiver chain, and the lien-rights picture โ€” the view that doesn't exist anywhere else. Start in 30 minutes; no IT department required.

Send your contract, certificates, and waivers. See where you stand.

A free contract-compliance review. No login, no commitment โ€” a clear read of where your project complies and where it doesn't.

Request a free review
Important: A contract-compliance review is a document reconciliation โ€” not a coverage opinion, insurance advice, or legal advice. We report what your certificates and waivers say and don't say; we do not determine whether you are covered or your legal rights. Confirm every flagged item with your broker and/or counsel before relying on it. Lien figures are the amounts on the documents you provide. Provided without warranty; not a substitute for your own professional review.